2026-10-21Composting & Fermentation
The aerobic fermentation tank combines a chamber, lifting feed system, aeration, hydraulics and biological odor treatment for manure and other organic materials. Compare chamber volume and the stated treatment quantity separately across the four sizes.
RY-ZNHBD / RY-ZNHBC / RY-ZNB / RY-ZNA
Key specifications: RY-ZNHBD
The tank is configured for aerobic treatment of livestock manure and other organic feedstocks. Its listed assemblies include the fermentation chamber, air supply, hydraulic loading, heating, odor treatment and controls.
Feedstock moisture and bulking-material conditions should be assessed before loading. Select the model and downstream process using the project-specific material and product target.
Scroll horizontally to view all models and values.
| Parameter | RY-ZNHBD | RY-ZNHBC | RY-ZNB | RY-ZNA |
|---|---|---|---|---|
| Fermentation chamber volume | 116 m³ | 90 m³ | 70 m³ | 32 m³ |
| Loading hopper volume | 1.5 m³ | 1.5 m³ | 1.5 m³ | 1.0 m³ |
| Upper air blower | 2.2 kW | 2.2 kW | - | - |
| Lower air blower | 18.5 kW | 12.5 kW | 11 kW | 7.5 kW |
| Hydraulic power station | 7.5 kW | 7.5 kW | 7.5 kW | 4 kW |
| Hydraulic oil heater | 4 kW | 4 kW | 4 kW | 2 kW |
| Loading port motor | 0.75 kW | 0.75 kW | 0.75 kW | 0.37 kW |
| Auxiliary heater | 12 kW | 12 kW | 4 kW | 2 kW |
| Odor treatment | Biological deodorization | Biological deodorization | Biological deodorization | Biological deodorization |
| Deodorization fan | 4 kW | 4 kW | 1.5 kW | 1.5 kW |
| Deodorization water pump | 0.37 kW | 0.37 kW | 0.37 kW | 0.37 kW |
| Lubrication | Centralized lubrication | Centralized lubrication | Centralized lubrication | Manual lubrication |
| Main unit weight | 30 t | 26 t | 23 t | 11 t |
| Material volume at 65% moisture | 15 m³ | 10 m³ | 7 m³ | 3 m³ |
| Tank height | 10–11 m | 10–11 m | 6.5–7 m | 6.5–7 m |
| Tank diameter | 5.5 m | 5.5 m | 4.5 m | 3 m |
Send us your material, moisture, site and power conditions and we will recommend the configuration and output.
Choose a brochure by language for technical and purchasing review.
Complete brochure
2026-10-21Complete brochure
Print editionChamber volume and treatment quantity are listed separately; treatment quantity is stated at 65% moisture.
Discharged material can enter fertilizer finishing. Powder and granular products require different combinations of crushing, screening, batching, granulation and bagging, selected for the discharge condition.
Describe your material, product or equipment needs to discuss the configuration.